Starting Base (EU)
Appearance
Replacement Cost of Starting Base
- 550K to 1000K depending on location - Access Lift / Base Creation
- 1200K - 2 Interceptors
- 500K - 1 Skyranger
- 800K - Workshop
- 750K - Laboratory
- 600K - 3 Hangars
- 600K - 10 Scientists
- 500K - 10 Engineers
- 320K - 8 Soldiers
- 400K - Living Quarters
- 500K - Small Radar
- 150K - General Stores
- 400K - Craft armament (arguably only 107K of which is useful) [1]
- 75K - Battlefield armament [2]
TOTAL $6.795 million plus location cost = $7.345 to $7.795 million. Typically $7.795 million as it is usual to locate the base in one of the most expensive locations (Europe, US or NE Asia).
[1]:
4 Cannon @30K, 9 x 50 rounds@1240, 37 Stingray@3K & 3 Launchers@16K, 10 Avalanche@9K & 1 Launcher@17K = $397.16K
[2]: 5/13 Pistol 800/70; 8/20 Rifle 3000/200; 2/8/1 HC 6400/300/500; 1/6 AC 13500/500; 1/4 Rocket 4000/600; 13 Grenade 300; 5 Smoke 150; = $76,160