HighwayConstruction (EU2012): Difference between revisions
Appearance
mNo edit summary |
No edit summary |
||
| Line 7: | Line 7: | ||
'''Notes''' | '''Notes''' | ||
* | * A long, fairly narrow map themed around road repairs/under-road-utility maintenance. | ||
* Several vehicles provide (explosive) cover of low/high type. | |||
* Construction supplies (signs, crates, portable toilets, etc.) provide cover of low/high type. | |||
* Used for Covert Data Recovery Missions. Refer to attached image for visual reference of Encoder/Transmitter locations. | |||
** The Encoder is placed in the low roadworks; the hack area is almost completely devoid of useful cover. | |||
** The Transmitter is placed in the bus approximately half-way between the Encoder and the Skyranger. | |||
<br clear="all"> | <br clear="all"> | ||
Latest revision as of 09:17, 1 August 2014
| Missions | Abductions Covert Data Recovery (EW DLC) |
| Length | 66 tiles |
| Width | 28 tiles |
| Area | 1848 tiles |
Notes
- A long, fairly narrow map themed around road repairs/under-road-utility maintenance.
- Several vehicles provide (explosive) cover of low/high type.
- Construction supplies (signs, crates, portable toilets, etc.) provide cover of low/high type.
- Used for Covert Data Recovery Missions. Refer to attached image for visual reference of Encoder/Transmitter locations.
- The Encoder is placed in the low roadworks; the hack area is almost completely devoid of useful cover.
- The Transmitter is placed in the bus approximately half-way between the Encoder and the Skyranger.
-
Loading screen
-
LZ overview
-
Opposite overview
-
Covert Data Recovery mission Starting Zones