Satellite Uplink (EU2012): Difference between revisions
Appearance
mNo edit summary |
m →Notes |
||
| Line 9: | Line 9: | ||
|requires=N/A | |requires=N/A | ||
|manpower=5 engineers, +10 for each additional Uplink | |manpower=5 engineers, +10 for each additional Uplink | ||
|costs=§150 | |costs=§150, 100(EW DLC) | ||
|power=5 | |power=5 | ||
|maintenance=§15 per month | |maintenance=§15 per month | ||
Revision as of 20:13, 5 December 2013
Notes
| Research Required | N/A |
| Manpower Required | 5 engineers, +10 for each additional Uplink |
| Base Costs | §150, 100(EW DLC) |
| Power | 5 |
| Maintenance | §15 per month |
| Build Time | 14 days |
| Provides | Deployment of 2 satellites |
| Adjacency Bonus | +1 satellite per Uplink/Nexus |
See Also
| Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
| Additions: |
| ||||||||||
| Strategic: | Building Optimization | ||||||||||
