Satellite Uplink (EU2012): Difference between revisions
Appearance
mNo edit summary |
mNo edit summary |
||
| Line 8: | Line 8: | ||
{{Facilities Data Box (EU2012) | {{Facilities Data Box (EU2012) | ||
|requires=N/A | |requires=N/A | ||
| | |manpower=5 engineers, +10 for each additional Uplink | ||
|costs=§150 | |costs=§150 | ||
|power=5 | |power=5 | ||
Revision as of 18:18, 2 November 2013
Notes
| Research Required | N/A |
| Manpower Required | 5 engineers, +10 for each additional Uplink |
| Base Costs | §150 |
| Power | 5 |
| Maintenance | §15 per month |
| Build Time | 14 days |
| Provides | Deployment of 2 satellites |
| Adjacency Bonus | +1 satellite per Uplink/Nexus |
See Also
| Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
| Additions: |
| ||||||||||
| Strategic: | Building Optimization | ||||||||||
