Jump to content

Talk:Engineering (EU2012): Difference between revisions

From UFOpaedia
Momerathe (talk | contribs)
mNo edit summary
Momerathe (talk | contribs)
No edit summary
Line 2: Line 2:
final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ]
final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ]
. It needs to be tested! [[User:Momerathe|Momerathe]] 17:33, 6 October 2012 (EDT)
. It needs to be tested! [[User:Momerathe|Momerathe]] 17:33, 6 October 2012 (EDT)
The engineers requirements listed for uplink/workshop/nexus are wrong - it depends on how many you already have built. [[User:Momerathe|Momerathe]] 05:27, 12 October 2012 (EDT)

Revision as of 09:27, 12 October 2012

I have a potential formula for manufacturing costs: final cost = round down [ base cost x 0.5 x (1+ (engineers required / total engineers) ) ] . It needs to be tested! Momerathe 17:33, 6 October 2012 (EDT) The engineers requirements listed for uplink/workshop/nexus are wrong - it depends on how many you already have built. Momerathe 05:27, 12 October 2012 (EDT)