Satellite Uplink (EU2012): Difference between revisions
Appearance
No edit summary |
m →Notes |
||
| (3 intermediate revisions by 2 users not shown) | |||
| Line 8: | Line 8: | ||
{{Facilities Data Box (EU2012) | {{Facilities Data Box (EU2012) | ||
|requires=N/A | |requires=N/A | ||
| | |manpower=5 engineers, +10 for each additional Uplink | ||
|costs=§150 | |costs=§150, §100(EW DLC) | ||
|power=5 | |power=5 | ||
|maintenance=§15 per month | |||
|build time=14 days | |build time=14 days | ||
|provides= Deployment of 2 satellites | |provides= Deployment of 2 satellites | ||
Latest revision as of 20:14, 5 December 2013
Notes
| Research Required | N/A |
| Manpower Required | 5 engineers, +10 for each additional Uplink |
| Base Costs | §150, §100(EW DLC) |
| Power | 5 |
| Maintenance | §15 per month |
| Build Time | 14 days |
| Provides | Deployment of 2 satellites |
| Adjacency Bonus | +1 satellite per Uplink/Nexus |
See Also
| Headquarters: | Mission Control • Hangar • Engineering • Research • Barracks • Situation Room | ||||||||||
| Additions: |
| ||||||||||
| Strategic: | Building Optimization | ||||||||||
